5 Questions 12 Answers 0 Followers
Questions related from Ehab Al Timimi
For post tension concrete slab, if strand cable blow out but and the central (king wire) exposed more than the other 6-wire strand, what this mean? The usual case that all 7 wire strand will be...
04 April 2019 3,330 3 View
Pleas, I have question, It is normal to see rebar deform surface effected in light weight concrete failed?
04 April 2017 9,595 0 View
the specification of PT slab: flat plate 9" slab (300' x 60'), 270 cables type mono strand, 1/2" dia 7-wire strand, E=28500 ksi, fpu= 41.3 kip. f jaking 70% fpu. Length cable = 231' type...
06 June 2016 2,553 7 View
06 June 2016 8,385 0 View
if I have the elongation for each cables, its correct that the average of the elongations will be considered as girder elongation value, then I can calculate the fps for the girder. I know that...
06 June 2016 8,787 5 View