10 October 2019 14 6K Report

I have been trying to simulate my system whose Simulink schematic is attached, and also I have attached my results.

The issue is, even though the wind is having sufficient generation, the power demand of the load is not absorbed from the wind, instead, the grid instantly delivers the power. My system comprises of PMSG based wind generator, Battery, Load Connected before the Isolation Transformer and Grid.

Can you please suggest where I am going wrong? I want the power of the load must be supplied by the wind generator. (my results are attached)