Assume there is a small stream with a maximum discharge of 4 cums (m3/s). We have to collect the flood runoff and also reduce the peak flow during the flood season. According to the river morphology there is a narrow section with an alluvial foundation. The topographical condition is such that limited us to have a structure with 10 m height. Which option is better on your opinion a) Earthen dike, b) Gabion weir to reduce the flow peak and collecting runoff to recharge the groundwater and etc.