I understand that, the disjoint two stage approach need to be used for higher order model construct. However, if I would like to report the reliability and validity in my pilot test, do I have to report the validity and reliability for only the lower order construct and report higher order construct in analysis for the measurement model. My focus here is on the pilot test.