I'm using PSAT tools for load flow analysis 14 bus system when I connected Photovoltaic generator the result is not changed, is there any other way how to connect Photovoltaic generator on busbar using PSAT?
In case i wont to replace a synchronous generator in bus 2 by Photovoltaic generator,add another bus bar pv or pq to connect or connect directly to bus 2?