ACI 301.5, ACI 301, and ASTM C94 set no temperature limit on fresh concrete in hot weather conditions if precautions are considered in proportioning, production, delivery, placing, and curing concrete. Nonetheless, ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C. This can be modified in accordance with project specifications.