Domestic wastewater treatment system consists of 2 systems of aerated (40000 m3 each), facultative (87500 m3 each), and maturation ponds (50000 m3 each) working in parallel. Total flow for the entire system is 0.80 m3/s.

EM product is applied only on the facultative lagoons. One restriction is that I cannot do any studies on both full scale systems because the applications cannot be stopped.

Thanks for your input, best regards.