To develop a construction and demolition waste management network that considers the expansion of municipalities, it is necessary to make predictions. These forecasts include an increase in the population, the amount of waste and the cost of infrastructure installation sites.
Can regression analysis, moving average, weighted moving average, Holt-Winters method, Box-Jenkins model, artificial neural networks and Gray model be used to solve this problem?