In grid-tied solar PV system if generated power by solar PV system is higher than the load requirement then the extra power will be exported to grid or if generated power lower than the load requirement then required power will be imported from the grid. How we can identify the imported and exported AC power flow?

More Maharaja Kamatchi's questions See All
Similar questions and discussions