I wish to simulate the network control of PV inverters. There are 5 PV units connected to the grid. I started with the existing Simulink model that has one 250 kW array connected to the grid. I am unable to connect multiple PV arrays to the grid. I am new to simulation of power systems, so I am unable to get the simulation running. I am not sure how to interface multiple PV units to the grid. Can anyone please help me with this? I am trying to reproduce the results of this paper: Article Distributed coordination control strategy for multiple resid...
on network control of PV inverters.