Hi, I'm modeling shear critical beams, some of them have stirrups and some don't. I got excellent results for the specimens without stirrups and low load capacities for those with stirrups. It looks like adding the stirrups didn't have any effect at all.

I then realized that if I load only the reinforcement (without the beam) the stirrups move independently from the rebars, looks like they are not connected.

How can I connect them properly? I tried using tie interaction but it didn't work as I expected.

Thank you in advance,

Sálvio.

More Salvio Aragao Almeida Junior's questions See All
Similar questions and discussions