I am working in grid connected permanent magnet synchronous generator based wind energy conversion system for maximum power point tracking. While i do the simulation, I am in unable to simulate more than 1 sec. It is showing that data logging error and it will show end now. Please any one tell me how to solve the issue. The generator speed, current every thing settle down before 0.04 sec.