I want to design an optimum time to shut in an existing gas well. it is already developed, produced for 3 years, and has tested result from previous well testing. is it okay to just follow the previous testing time? while I'm not really sure the previous test  has an optimum time. do you have any article or paper that can explain the step by step?

Similar questions and discussions