Optimal methodology for capacity payment generators according to their availability is required. Some countries for payment consider the probability of loss of load (LOLP) at peak hours to obtain a firm power. other countries do not consider the LOLP, use a history of availability of the units according to the type of technology to define a definitive factor for calculating the monthly payment annuity power. Because some countries do not use LOLP?