From the attached article, SSSC is modeled using PIM, however for the control of power flow of a local line, i.e. line of SSSC insertion.

In this model, the SSSC current is a function of the specified/required amount of flow on the line.

By remote line I mean a line other than the SSSC line of insertion while a local line is the SSSC line of insertion.

More Ahmad Abubakar Sadiq's questions See All
Similar questions and discussions