After aeration phase, sludge settling has improved and seen initially 15 to 20 mins, but as high concentration of stalked ciliates are present, the ciliates with sludge is coming to top of the reactor, causing sludge wash out in decant waster. How to control this stalked ciliates conc.? or any other solution?