What are the reasons for the failure of the indicated pier of the bridge? What is the expected type of load that led to this damage? Design errors or the approved specifications did not cover this type of failure is avoided? Was the failure less severe if two circular piers were used instead?what is the possible method to be adopted to repair this damage?