As laying of stone pitching and transporting of same is time taking process, we are planning to go with 100mm thick concrete panels. As IRC 89 states minimum thickness of 300mm shall be considered for stone pitching. I need to justify the 100mm thickness of concrete panels as further increase in thickness is not economical.