Lets say there are more than one alternator connected parallel.

All of them are operating at base load. 75*4=300 MW) .

If the load is increased say (320 MW) governor cannot increase fuel as it is already full open.

The frequency goes down, the kinetic energy stored in generator will provide extra torque .

The load angle will change.

At new equilibrium point the generator are at 80 MW each.

Now the design capacity of turbo gen is just 75 MW , it is supplying 80 MW. Fuel supply is same.

What will be design and operation constraints if load continue to increase other than (under frequency protection )

The efficiency is ratio of KWh and heat energy input . So in this case it seems that efficiency is increasing.

Complex is producing more than declared availability so its capacity factor would increase beyond 100%

More syed taha Ahmed's questions See All
Similar questions and discussions