You are contractor of a construction project.

There is a problem. Problem is late approval of feasibility reports, work permits, drawings and materials by owner of the project.

1) How do you plan to prevent occurrence of this problem?

If your preventive actions are not successful, how do you control the consequences of this delay?

2) or What will be your mitigation measures as contractor to makeup gone time and cost ?

3) What would be if you are in owner position?