I'm extremely confused with the usage of these three terms in the geotechnical analysis, aslo related to the definition of initial conditions for soil stresses
A Geostatic step is defined in order to apply initial stresses in the model. An equilibrium is therefore established between the initial stresses and the gravity load.
Defining a gravity load, ABAQUS will calculate the resultant force using the user-defined acceleration magnitude and density of the material.