When I am replacing fine aggregates with slag in geopolymer concrete, after some time of the casting work, bubbles develop at the surface of the geopolymer concrete, due to which lubricant comes out and slow down the setting time, along with that it also makes the surface of specimens rough at the time of demoulding. Please suggest some idea.