In some models of distribution system expansion planing  the cost of purchased power from the transmission network and energy loss cost are considered simultaneously. But, others consider only the second term. regarding that loss cost is embedded in the cost of purchased power from the transmission network, the question is that why these terms are considered concurrently in some models?  

Similar questions and discussions