To analyze the potential of 5D Building Information Modeling (BIM) in addressing cost overruns and scheduling delays in the residential sector, it is essential to evaluate how effectively 5D BIM integrates cost and time data into the digital model, allowing for real-time adjustments and more accurate forecasting. By enabling early detection of design and construction conflicts, 5D BIM can potentially minimize budget deviations and improve project timelines. Evaluating the current state of BIM involves assessing its adoption levels, technological advancements, and barriers within the industry, particularly examining factors like interoperability, training, and stakeholder collaboration that influence its effectiveness in construction projects.