Hydro power plants may jump-in within 1 min while lignite power plants need 8 hours to start (cold start) - if the prediction for wind&solar proves wrong. To plan an energy supply mainly based on renewables, the composition of the power plants has to allow for a secure supply. To get the value of the different back-up options, the costs per kWh have to be considered, but also the possible ramp-up time (e.g. in MW/s or a delay in s) - how much is a faster ramp-up time worth ?