I am working with data coming from drilling exploration surveys done in the petroleum industry and also drilling data from the available ODP/IODP surveys.

Even though I think they mean the same thing, I found on the one hand that reports (from around the end of the 1990's) dealing with the industrial data sets always refer to a drilling site as a "well", for instance: "the Gringo well was drilled on time".

On the other hand, ODP reports (from around the end of the 1980's) always refer to a drilling site as a "hole": "the Gringo hole was not drilled, but the Greengo was indeed drilled on time".

"Borehole" seems to be (at least to me) a common way to refer to all drilling sites, whether it is drilled by a petroleum/exploration/production/etc survey, or a geotechnical survey, or ODP, etc.

Any pointers will be really appreciated! Thanks in advance.

Similar questions and discussions