Normally after the laying of sub-base layer of the paving slab/interlocking blocks, a 30mm thick sand bedding is screeded and tamped over the pavement area. Then paving slabs are laid horizontally with joints of 2-3mm wide and are laid in uphill direction. After completing the laying of paving slabs, sand used for filling joints is spread over the surface of the units and brushed into the joints such that all joints are completely filled. The paving slabs are then bedded into final position by using plate vibrators. The sand layer serves the same purpose of normal blinding layer under concrete structure:
(i) Provide a level and flat surface for the paving slab/interlocking blocks to lay on;
(ii) Protect the foundation (i.e. underground subgrade and sub-base layer) against adverse
outside conditions (e.g. bad weather) during construction of the laying work of paving