Iam writing the HETVAL subroutine in Abaqus.I want to start the TIME(2) ie total time from beginning after the end of each if else statement in my subroutine.
You can not control TIME(2) in the script. It is the step time provided by the ABAQUS. Use can define a new variable=TIME(2) and then use it the way you want to use.
Thanks a lot for your answers.Actually i want to specify the control statement based on TIME(2) and material name on my subroutine.Subroutine runs well but does not detect the material name in subroutine.
Thanks a lot for your answers.Actually i want to specify the control statement based on TIME(2) and material name on my subroutine.Subroutine runs well but does not detect the material name in subroutine.