I have made an modified concrete with sewage sludge powder(M35), the partial replacement was done with fine aggregates 5 and 10% only. Water requirements was more W/C (0.47) and superplasticizer (1.5%), to achieve the slump 100 mm. sample casted and cured for 28 days. After 28 days i tried to take compressive strength but, the sample has not at all set, it was broken easily. What may the problem?

Similar questions and discussions