There are many factors, by which critical clearing time could be increased. Mainly are the online computer controlled monitoring system and load dispatch centers, with increased interconnection of system. Modern system are more reliable(99%) due to increased rigidity......
The transient stability mainly depends on the magnitude to fault and the instant of fault occurring at which bus.If the fault is a LG at generator then it is severe and transient stability has major effect on the power system.