Given the processing times for parts to be manufactured in different machines in a flow shop line, depending on the sequence in which the parts are manufactured, the makespan (i.e. the total time that elapses from the beginning to the end) can be reduced. The lower bound is the minimum value of the makespan.

Similar questions and discussions