Looking for a case study where severe influx and loss events were experienced even when a MPD system is installed and active. Interested in the sequence of events and mitigation steps.
A real well example, not theoretical discussions. A big shout out to the petroleum engineers, drilling engineers, MPD experts and wellsite folks.
Thanks in advance.