After click Analyze Post-Place and Route static timing, the report summary says the following info:
Minimum period: 8.432ns{1} (Maximum frequency: 118.596MHz)
1、Now, my task is to better Maximum frequency, first I need to find the critical path, but I have the difficulty in identifying it in the timing report. Could anyone give me some guidance?
2、I have another question. What are the Timing Constraints in timing report for? Whether the critical path is related to the error constraint in the Timing Constraints?
The attached files give the detailed info about the timing report.
Thank you very much.