Biological commissioning of a large-scale biogas plant typically requires a sufficient amount of organic matter, such as cow dung, to:

1. Seed the digester: Introduce microorganisms to the digester to start the anaerobic digestion process.

2. Start biogas production: Generate biogas to test the plant's performance and ensure biological stability.

If cow dung is not readily available, consider the following alternatives:

1. Other organic substrates: Use alternative organic materials like:

- Pig manure

- Chicken manure

- Food waste

- Crop residues

- Municipal organic waste

2. Inoculum from existing biogas plants: Obtain a seed slurry (inoculum) from a nearby operating biogas plant to introduce microorganisms to the new plant.

3. Purchase seed slurry: Buy a seed slurry from a reputable supplier or biogas plant operator.

4. Create a seed slurry: Mix a small amount of available organic matter with water to create a seed slurry, which can be used to inoculate the digester.

5. Gradual commissioning: Start with a small amount of substrate and gradually increase the feed rate to allow the microbial community to adapt and grow.

Remember to ensure the selected substrate is suitable for the plant's design and operating conditions. It's also crucial to monitor the plant's performance and adjust the feed rate, pH, temperature, and other parameters to maintain a healthy microbial community.