Are there some equations or cases study about the relation of overbreak in tunnels related to Stress condition and joint discontinuities? I read about Barton & Grimstad (2014) article and they said that "If a rock mass has characteristics such as Jn = 9 (three joint sets) and Jr = 1 or 1.5 (smooth planar or rough planar joints), there may be sufficient risk of overbreak that the economy of the project is affected.".
What do you think about it, or could you provide some case analysis of this?
Regards