2 Questions 3 Answers 0 Followers
Questions related from Babak Ahmadzadeh-Shooshtari
Vector is n*1 and its covariance matrix is n*n.
09 September 2015 4,478 1 View
The generator supplies a parallel RL load. The fault occurs at t1 and it is cleared at t2. The dynamic simulation interval includes pre-fault, fault, and post-fault conditions.
11 November 2014 5,397 3 View