The DGs normally discussed in research papers are of small capacity and connected to the distribution network. But, if DG or DER is connected directly to the transmission grid, its capacity will be somewhat more.
What is the maximum capacity of DG which can be installed in transmission network and what is the maximum present capacity already installed, what is its type i.e., solar, wind, etc?