I have observed deferent kind of behaviour of concrete in temperature control mix concrete and normal mix concrete

My observations are as below

1.when we use normal mix concrete in that case - temperature of concrete is raising initially very fast within 45 minutes but after that temperature is slightly decreased instead of raising as per theoretical requirements.

2.in the case of temperature controlled concrete mix - we are getting Concrete behaviour as initially low then raising slightly while time is passing at site and this behaviour is matching with theoretical concepts...