Most of the borewell are unable to pump required amount of water as we know that groundwater table decrease day by day and curing is necessary for concrete. Currently most of the contractors/supervisors are unable to provide the required amount of curing which reduces the workability of concrete.
Is there any alternative to increase the workability of concrete?