Dear Sir,
We all know that the water cement ration 0.45, which may vary due to the Mix-Design. But during the concrete due to changes of weather & materials SSD condition the slump changed (Generally Dropped) in mid time.
So looking the help from experience person, how many water may use for 1mm/5mm slump gaining. The equations also okay, I can check with our mix-design for getting the value.
Thanks in advance for your assistance.