How much minimum accepted distance of cores in the evaluation of Concrete strength? what we can do to retrofit core place and losses of reinforcement?

We have a tunneling project and our construction team used drilled cores to evaluate compressive strength of concrete. Two cores have drilled in a near distance and some of reinforcement is unfortunately cut in sampling process. what we can do to repair the loosing of rebars?

thanks a lot

Best Regards

Similar questions and discussions