I am analysing the route that spare parts follow in a manufacturing plant, and I should determine the costs deriving both with availability (i.e. stock costs in warehouse) and unavailability (i.e. the costs caused by the lack of the products themselves)

The total cost should comprehend both the two costs (stored and missing materials), but the second term is particularly difficult to identify.

Could you please suggest me an approximate way to calculate it? Is there a correlation, for example in terms of percentages of the unitary cost?

Than you in advance