I want to conduct Heijunka project in the manufacturing industry. But, I do not have any detail knowledge about how I can implement. Can you share with me an example of Heijunka implementation?
1. Coleman, B. J., & Vaghefi, M. R. (1994). Heijunka (?): A key to the Toyota production system. Production and Inventory Management Journal, 35(4), 31.
2. Hüttmeir, A., De Treville, S., Van Ackere, A., Monnier, L., & Prenninger, J. (2009). Trading off between heijunka and just-in-sequence. International Journal of Production Economics, 118(2), 501-507.
3. Rewers, P., Osiński, F., & Żywicki, K. (2018, June). Classification of Products in Production Levelling. In International Conference on Innovation, Engineering and Entrepreneurship (pp. 411-417). Springer, Cham.
1. Coleman, B. J., & Vaghefi, M. R. (1994). Heijunka (?): A key to the Toyota production system. Production and Inventory Management Journal, 35(4), 31.
2. Hüttmeir, A., De Treville, S., Van Ackere, A., Monnier, L., & Prenninger, J. (2009). Trading off between heijunka and just-in-sequence. International Journal of Production Economics, 118(2), 501-507.
3. Rewers, P., Osiński, F., & Żywicki, K. (2018, June). Classification of Products in Production Levelling. In International Conference on Innovation, Engineering and Entrepreneurship (pp. 411-417). Springer, Cham.