Data centers load is basically server work load and cooling load associated with it. In literature papers, there are ways to model the IT load (delay tolerant and delay sensitive) and also cooling load, but how can we use that model to find uncertainty of the load. Is the uncertainty assumed by specifying the range of demand, or can be solved as a stochastic optimization considering different scenarios? 