• The capacitor bank has 5 steps each of 300 kVAr and I need to write a DSL script for switching it on step by step as the active power generation increases. For eg.

  • The following start-up conditions apply to the implementation of the regulation for the compensation plant: • Criteria 1: Power factor preset by the grid operator of cos φ = 0.925 overexcited • Criteria 2: P> 20.00 MW - 1st switching stage 0.3 MVAr P> 20.50 MW - 2nd switching stage 0.3 MVAr P> 21.00 MW - 3rd switching stage 0.3 MVAr P> 21.50 MW - 4th switching stage 0.3 MVAr P> 22.00 MW - 5th switching stage 0.3 MVAr